The following data is compiled from the Repair Breakdowns for all nine blocks on Crossfields, and makes reference to the Programmed Estate Report by Quality Officer Leif Law that took place last summer. This can be downloaded from the Appendix pages. 

What is also apparent is that items in Repairs Breakdowns, apart from being unintelligible, are quite often not presented in date order, making it harder to see a pattern of repeat orders in problem areas. This may be deliberate. It certainly does not aid transparency.

This is a long list, but look for your block in each section.

...................................................................................................................................

The repairs listed here are covered by the Programmed Estate Report where it was agreed that they were not done properly and should not be paid for. 

Cremer:
3697845    Repair paving in front of block      £180.86    06/10/08
All the paving was requested to be repaired free of cost since previous repairs have never been done properly. (See 4.11 of Leif Law's report)

Castell:
3612292    Please clear drain to front of No.1      £125.44    07/03/08
3611826    Tnt rpts external drain at front of the block is blocked     £40.40      06/03/08 
Problems with these drains are due to a) pooling of water during heavy rain, due to poor laying of tarmac, and more importantly b) gulleys that were put in to filter leaves etc and lead to these drains have been blocked for years and have never been cleared. They were cleared in the summer as a result of the Walkabout. (See 4.2 of Lief Law report). Blockages in 2008 should not be paid for. 

Castell:
3645819    Repair all cracks on grnd floor walkway facia from flats 1-9    £84.00   28/5/08
3728570    Pls rem cracked wall on grd floor      £15.87     15/01/09
These repairs were done inadequately since wall was in dire need of repair by June 2009 (see 4.3 of Leif Law report) and should not be paid for.

Farrer:
3653779    Rear/side of block replace missing section of fencing    £375.00    17/06/08
Could this be the same bit of fence referred to in 2.4 of Leif Law report, ie not done. Awaiting confirmation from Leasehold Services.

...................................................................................................................................

Wall by Nature Park front of Congers House (Finch, Congers, Farrer):

Finch  3653801   Rebuild wall by nature park front of Congers   £282.14  17/06/08
Farrer  3653801   Rebuild wall by nature park front of Congers   £451.20  17/06/08
Congers  3653801  Rebuild wall by nature park front of Congers Hse   £451.20  17/06/08
TOTAL  £1185.00
Which wall? If wall in front of Congers, why does Farrer have to pay more than Finch or even at all?
Possibly this is the broken wall next to the Memorial Garden by Farrer House. The one that was never rebuilt (see 3.2 in Lief Law report). We await confirmation from Leasehold Services' investigation.

...................................................................................................................................

Chute Shut Offs & Bin Chamber Doors (all done on 03/07/08):
Chute Shut offs are where the chute fans out into two funnels above the bins – either can be shut off  to direct rubbish to either bin. The caretakers have said it makes no difference whether they work or not.

Cremer:
3661791   Blk1-14 Unable to close chute shut off  £160.00   03/07/08
Finch:
3661784   Blk chute shut off will not close  £320.00   03/07/08
Wilshaw:   
3661800   Blk 1-20 unable to close chute shut off  £160.00  03/07/08
3661801   Blk 21-40 repair bolt that needs to be fixed  £160.00  03/07/08
3661804   Blk 41-60 unable to close chute shut off also fix bolt  £160.00  03/07/08
Holden:
3661795   Blk unable to close chute shut off  £160.00  03/07/08
3661796   Blk 21-40 unable to close chute shut off  £160.00  03/07/08
3661799   Blk 41-60 Unable to close chute shut off  £160.00  03/07/08
Congers:                   
3661785   Blk both chamb unable to lock nr no.2 unable to close chute £320.00 03/07/08
Castell:   
3661788   Blk 1-22 Ease and adjust also chute shut off not closing £320.00 03/07/08
TOTAL (NB Browne, Frankham, Farrer excluded)   £2080.00
This was a job lot all done on same day. Were Browne, Frankham and Farrer excluded because they didn't manage to fit them in or because they didn't need fixing?
How long had each been defective if at all? Each chute cost £160, NB in some cases the bolts were fixed as well or instead. The next month there were further repairs...Wilshaw got a double dose:


Wilshaw:
3577383    Pls fix lock on bin door that is broken as rptd by c/tkr  £37.03  12/08/08
Which bin door? Previously done above (see 3661801)
3677027    Block 20-40. Pls ease and adjust bolt lock to bin chamber  £117.60  11/08/08
This is a repeat of previous repair (above) 3661801 (£160.00) and should not be paid for
3702967    Lock to bin chamber faulty pls rem     £27.98    21/10/08
Which bin door? Previously done above?

Why are locks being repaired on NEW DOORS (that we didn’t need) for which we only just paid for last year?


...................................................................................................................................

Roof Leaks / Repairs

Cremer:
3665117    Leak from Roof Area     £163.01    14/07/08
3713636    Attn LDL flat nr13 Carry out roof repair    £900.60    21/01/09
Finch:
3691550  Attn LDL C/Picker and roofing work above 21 as per quote.  £850.25 16/09/08
Farrer:
3625125    Insp loft area for possible leak affecting flat 33    £171.14    09/04/08
3645122    As agreed several minor repairs to roof     £356.25    27/05/08
See previous post re Farrer roof
Frankham:
3682040    Pls trace and rem leak from roof above no37        £703.01    22/08/08
Browne:
3646713    Repair all gutters blocked 5 storeys            £259.54    30/05/08
3722085    Repair roof as it leaks into props 12-13-14        £163.01    19/12/08
3733737    Supply platform and carry out roof repairs        £621.77    19/12/08
3722085 and 3733737 same job?

...................................................................................................................................

Gully covers
Where are these gullys? Why do Holden/Congers cost more per unit? Listed according to date:

Farrer:  3608244    Renew 6 NO 6” gully covers & frames (£14.36 ea)  £86.47  26/02/08
Congers: 3608240    Renew 3 NO 6” gully covers    (£28.84 ea)    £86.53   26/02/08

Wilshaw: 3612918    Renew 10NO gully covers     (£15.28 ea)    £162.88  10/03/08
Holden: 3615103    Renew 11NO gully covers     (£31.50 ea)    £346.50  14/03/08
Farrer:  3655351    Renew 2NO gully covers     (£14.86 ea)    £29.73   20/06/08
Castell:  3608233    Supply & fit 2 5” gully plates    (£14.41 ea)   £28.82   26/12/08
Finch:  3608249    Renew 6NO 6” gully covers     (£14.42 ea)    £86.53    26/02/09

..................................................................................................................................

Drain Cleaning at Farrer House
There appears to be a lot of drain clearing at Farrer (these items are not provided in date order on the breakdowns).

3651102    9 rpts smelling blocked drains in front of flat     £42.57     10/06/08
3651823    Planned jetting maintenance                                £249.52    12/06/08
3652517    Confirmation of planned jetting maintenance      £265.39    13/06/08
3680661    15 rpts blocked main drains                                  £36.22     22/08/08
3697172    Programmed jetting clear all drains/gullies          £117.58     03/10/08
3697211    Programmed works clear 10 gullies                     £218.50     03/10/08
Why is this being done again, less than 3 months later? Were all drains cleared? How many gullies have Farrer got? On 12th & 13th June 2008 it cost £514.91. On 3rd October 2008 it cost another £336.08. What is the problem that cost £855.99 over 5 months?

..................................................................................................................................

Tank overflows at Wilshaw House
Wilshaw appears to have an excess of water problems (these items are not provided in date order on the breakdowns).

3629397   Investigate leak to main supply pipe to block    £60.29  18/04/08
3662730   Communal tank o/flow dripping onto canopy 25-40   £29.72   07/07/08
3663497   No11 rpts leak from balcony above running along down   £38.03  09/07/08
3700638   C/T repts leaking overflow pipe block 21-40    £32.84  14/10/08
What, again? See 3662730.
3704757   Attn Cliff Pankhurst as your MB1 Renew inch & halfball valve £36.49 27/10/08
3718530   Pls trace and rem water leak in the comm loft     £34.54   08/12/08
3721940   Pls rem the water tank that is overflowing    £37.54   18/12/08
3722065   Plz restore water to block no water in bathroom Block 21 to...  £41.47 19/12/08
Block 21 to what? This is the same day as below, funnily enough, and the day after a pipe overflow problem is fixed.
3722251    45-65 oflow to MST leaking pls rem access from 4th flr   £32.84   19/12/08
3723079    Insp loft area for possible leak affecting flat 39      £163.01   23/12/08
What the fuck is going on?

...................................................................................................................................

Miscellaneous

Finch:
3699507  Blk remove concrete step at back of bin chamber also take.  £325.00  01/10/08
What concrete step at the back of bin chamber?

...................................................................................................................................

Pest Control
No repair number was provided and no dates or whereabouts. Leasehold Services provided these details after enquiry. 

Holden House (Pram sheds): Rats (Baiting) 24/01/2009   £360.00
Browne House Tank Room:  Squirrels 31/12/2008   £150.00
Wilshaw House:  Baiting 09/09/2008 £75.00
Wilshaw House:  Baiting 08/10/2008 £360.00
 
...................................................................................................................................

Security Lights

Finch:
3699507    Light to com area 2nd flr outside 10 faulty please rem    £100.13   10/10/08
3712921    8 lights to block faulty pls rem 07736374616     £95.36  19/11/08
So one faulty light costs £100.13 but 8 lights only cost £95.36.
Wilshaw:
3660828    Trace and rem fault with light b/w top and 3rd flr. Rptd by.  £127.09  01/07/08
3691508    C/taker rpts faulty light override using sensor     £109.66  16/09/08
Holden:
3740684    Problem with all communal lights     £36.49   22/05/08 
3740503    Repair communal lights not working in Block 1-20   £114.43   25/02/09
Congers:
3736069    Trace fault(s) on communal lighting circuit and rectify  £114.43  10/02/09
Frankham:
3707610    Repair defective security light o/s no 37   £50.38    04/11/08 
3709054    C/t repts security light outside no 9 not working    £100.13  10/11/08
3713194    Ground floor lights not working x4 outside 1-9    £237.61  20/11/08
3715903    Two security lights are missing from the side of Frankham  £72.06   28/11/08

...................................................................................................................................